- Drilling Rig[10]
- Drilling Machine[3]
- Contact Person : Ms. Jiao Bella
- Company Name : Beijing Cortech Drilling Equipment Co., Ltd
- Tel : 86-010-59361668 -885
- Fax : 86-010-59361660
- Address : Beijing,Beijing,Room 1022, Tower D, Morgen Center, 6 Taiping St., Xicheng District, Beijing, 100050, P.R. China
- Country/Region : China
- Zip : 100050
CMD100 Coalbed Gas Drilling Rig
1. Main Introduction:
CMD100 is designed for coalbed gas drilling, water well drilling, mine rescue drilling, shallow petroleum/natural gas drilling and mineral investigation etc.
The following below defines all the drilling techniques of CMD100
Circulation coring drilling Single wall rod, air-lift RC drilling Auger drillingDiamond core drilling DTH hammer, normal circulation drilling/RC drillingThe whole system consists of rotation head, feed system, power unit, mast, truck base, jib boom&winch, power break out, foot clamp and water pump, etc.
The features below defines CMD100 coalbed gas drilling rig
1.Truck chassis mounted for easy transport and less working intensity.
2. The whole rig is driven by hydraulic and equipped with kinds of safety guards on controls of pulling force, feed force, output torque and drill head feed locking, etc.
3. Due to design of two gear shift on drill head, difference torque and rotation speed can be realized and meet requirements of different hole size and drilling technique, max. torque 24,750N.m for big hole size drilling and max. rotation speed 300rpm for coring drilling.
4. Drill head can be set to 80° angle and main spindle floats 102mm, both for easy rod handling and less working intensity.
5. Drilling pressure can be adjusted precisely in accordance with geological conditions.
6. Braking system set on main shaft of drill head for directional drilling and horizontal drilling.
7. Telescopic design of mast facilitates rods&tools handling and provides 12.5m feed stroke.
8. Air/water pipe line mounted to connect related accessories of different drilling techniques, like fluid drilling, air drilling and foaming drilling, etc.
2 Specification:
1. FEED SYSTEM | |||
1.1 | Max. Pull | 100 Ton | |
1.2 | Max. Push | 14.5 Ton | |
2. SLIPBOX | |||
2.1 | Max. hollow | 810mm | |
2.2 | Control Panel to Ground, Max. | 2.08m | |
3.DRILL HEAD | |||
3.1 | Rotation Speed | 0-100rpm, low gear | |
0-300rpm, high gear | |||
3.2 | Output Torque | 24,750N.m@0-100rpm | |
8,700N.m@0-300rpm | |||
3.3 | Spindle Hollow | 105mm | |
torque controller mounted | |||
4. MAST | |||
4.1 | Mast Length | after telescopic(full length)-21m | |
before telescopic-13.4m | |||
4.2 | Feed Stroke | 15.2m | |
4.3 | Rods & Casings | I(18-22 feet) II(27-30 feet) III(38-45feet) | |
4.4 | Number of Jack Legs | 6 | |
5.DIMENSIONS | |||
5.1 | Gross Weight | 60 tons | |
5.2 | Transport Size | 14.56*2.95*4.25m | |
6. TRUCK CHASSIS | San Jiang vehicle, 10X6 | ||
7. POWER UNIT | |||
7.1 | Diesel Engine | Cummins KTA19-P750; 750hp @ 1800 rpm | |
7.2 | Displacement | 19L | |
8. PREHEAT SYSTEM | |||
8.1 | Model | engine coolant preheat | |
8.2 | Description | preheat engine coolant to 40-52°C for engine start when ambient temp. around -40°C | |
9. WINCH | |||
9.1 | Max Pull | 5.5 tons | |
9.2 | Winch Cable | 35m x 14mm | |
10.AIR/MUD LINE | |||
10.1 | Mpa | 20.6 Mpa | |
10.2 | Air Compressor | option | |
10.3 | Mud Pump | option |
CMD100 Coalbed Gas Drilling Rig